Architexturez > E-Mail Lists > [ Design-L.V1 ]
(static) Archive of Design-L, 03-1992 to 11-2004
Design-L activity continued at... AZ: Glossolalia, "speaking in tongues"...
 

Re: Blackout in NYC


List Information Page (subscribe to this list here) + RSS Feed
switch to: Subject Directory | Date Directory | Author Directory -

 
<< Thread Prev < Date Prev ^ date index+… ^ thread index+… Date Next > Thread Next >>
message ## 20136…

 
+  From: human being <human@xxxxxxxxxxxxxxxxxx>
+  Date: Thu, 14 Aug 2003 17:52:06 -0500
thanks James for the clarification on the phone system:

The telephones switches are powered by the same grid. They are
equipped with battery and generator back up. Also they have "save"
modes where they can shut down all but emergency and priority circuits
in case of major outages.

JYA wrote:

Mayor Bloomberg says that power is now starting to come back,
a bit at a time as the individual elements of the grid are restored,

the other thing i heard was that four (i think the number was 4)
nuclear power plants had to be turned off in New York State
due to a loss of external power, which it may have also been
stated that this is not a quick-fix of turning them back on as it
may be for getting other systems back online quick. fyi...

brian

--
The Design-L list for art and architecture, since 1992...
To subscribe, send mailto:design-l-subscribe-request@xxxxxxxxxxxxxx
To signoff, send mailto:design-l-unsubscribe-request@xxxxxxxxxxxxxx
Visit archives: http://lists.psu.edu/archives/design-l.html
 
Previous by Thread: Re: Blackout in NYC
Next by Thread: Blackout in NYC
 
Partial thread listing: